Relax time is important. 20 minutes between first and second stages, long as possible between second and final torquings (preferably overnight). You back off ¼ turn and then swing the bolt up to spec. (Only back off the actual bolt being torqued.)
Also a tiny dab of motor oil or moly grease on the bolt thread, under its head and on any head bolt washers, is necessary for an accurate reading.